The aim of swinging crane project is to demonstrate research component of project, examine and improve last year’s project, perform analysis, show understanding of theoretical principles, simulations and experiments, then improve system robustness, calculating instantaneous energy and optimize system motion trajectories. The 5 objectives of this project are shown as bellow:
 
The aim of swinging crane project is to demonstrate research component of project, examine and improve last year’s project, perform analysis, show understanding of theoretical principles, simulations and experiments, then improve system robustness, calculating instantaneous energy and optimize system motion trajectories. The 5 objectives of this project are shown as bellow:
 
1.Modelling of system – physical principles, approximates which can be used to simplify model (e.g. linearized model).
 
1.Modelling of system – physical principles, approximates which can be used to simplify model (e.g. linearized model).
 +
 
2.Selection of reference trajectories-trade-offs, constraints, optimization.
 
2.Selection of reference trajectories-trade-offs, constraints, optimization.
 +
 
3.Calculation and control of “energy” stored in pendulum-means for damping energy.
 
3.Calculation and control of “energy” stored in pendulum-means for damping energy.
 +
 
4.Simulation of system- investigates and checks performance.
 
4.Simulation of system- investigates and checks performance.
 +
 
5.Experimental demonstration- interfacing operation, model verification.
 
5.Experimental demonstration- interfacing operation, model verification.
  

Revision as of 12:45, 6 May 2015

Project aim: Swinging Crane project is aim to transporting a payload from one place to another and reducing the consuming time as much as possible.

1.Project introduction

Figure 1.Gantry crane system model

1.1.Technical background

Gantry cranes are wildly used in industry, for lifting heavy objects by a hoist which is fitted in a hoist trolley and can move horizontally on a rail or pair of rails fitted under a beam.

Figure 1 demonstrates the model of swinging crane, the DC motor controls the trolley to horizontally move a load in a short distance. There are two encoders to record the data, one is the moving distance, and another is sway angle of the load. By giving a signal from operation control system, it will generate a DC current from a current source, then injecting it into a motor, which would drive the conveyor belt. There is a trolley placed on one side of the belt, and start moving towards another side. At the bottom of the trolley, using a rod stand for the hoist, connect with a load. At the start of transporting the loads, it will cause accelerated, corresponds to a traction force, effect on the trolley. There occur an angle between the rod and vertical. After the trolley stops, the loads may turn to oscillate. If the initial angle large, the oscillation duration roses, which is a potential risk to the people on the ground.

Figure 2.System structure flow
Figure 3.Plant structure flow

The system is operated inside a flow, shown as Figure 2. Input signal is generated from Simulink, goes into the plant through dSPACE and amplifier. The outputs of the plant are measured by two encoders, and send back to dSPACE, finally transfer to the computer. The dSPACE and amplifier components will introduce later. The plant is the real model of the system, the transfer relationship is shown in Figure 3. The current flows into DC motor, which drives the belt on the grid. The trolley is bind on the belt, thus it has the same acceleration with the belt. There are two outputs from the, the trolley position and the swinging angle of the pendulum.

1.2.Motivation

The gantry crane system could be identified into separate sections: linear motion and swinging pendulum. The goal is to minimum the time used to transport loads and reduce the swinging oscillation as minimize as possible. The pendulum was studied by Galileo, Huygens, Newton, Hooke and all the leading figures of 17th-century science. Since the long history on the study, pendulum theory has been almost perfect, but still exist imperfection in applied to practical. In this project, the basic model is simple gravity pendulum. To analyse the motion parameters of pendulum, Newton’s classical mechanics Laws are applied. In traditional education, Newton’s lows are taught in high-school physics lecture. The theorem is abstract to student, and divorced from the practical application. The gantry crane system is a representative application, and easy to understand, thus it is suitable for demonstration teaching purpose.

1.3.Objectives

The aim of swinging crane project is to demonstrate research component of project, examine and improve last year’s project, perform analysis, show understanding of theoretical principles, simulations and experiments, then improve system robustness, calculating instantaneous energy and optimize system motion trajectories. The 5 objectives of this project are shown as bellow: 1.Modelling of system – physical principles, approximates which can be used to simplify model (e.g. linearized model).

2.Selection of reference trajectories-trade-offs, constraints, optimization.

3.Calculation and control of “energy” stored in pendulum-means for damping energy.

4.Simulation of system- investigates and checks performance.

5.Experimental demonstration- interfacing operation, model verification.

2.Background

3.Previous work

4.Model designing

5.Control methods designing

6.Hardware test and interfacing

7.Results comparison

8.Conclusion

9.Group members

Liyan Yi

Xianghui Ma

10.Supervisors

Dr.Wen Soong [1]

Dr Braden Phillips [2]

References