Electrical system in Australia is unique. It is marked by the some complex parameters such as fluctuation in electrical price, high demand of electricity, ageing of the electrical system and also the penetration of renewable energy technology into the grid.  However such an accurate model of this complex system is still unavailable. Therefore, there should be a model of this system provided so that the system could be optimized.
  
 
The aims of this project is to provide the model of the distributed generation system together with the optimization of the system itself by using Labview. The optimization in this project will consider some variables such as power loss, running cost and also efficiency.
 
The aims of this project is to provide the model of the distributed generation system together with the optimization of the system itself by using Labview. The optimization in this project will consider some variables such as power loss, running cost and also efficiency.
 
  
 
== '''Group Members''' ==
 
== '''Group Members''' ==

Revision as of 21:23, 7 October 2014

Project Information

Electrical system in Australia is unique. It is marked by the some complex parameters such as fluctuation in electrical price, high demand of electricity, ageing of the electrical system and also the penetration of renewable energy technology into the grid. However such an accurate model of this complex system is still unavailable. Therefore, there should be a model of this system provided so that the system could be optimized.

The aims of this project is to provide the model of the distributed generation system together with the optimization of the system itself by using Labview. The optimization in this project will consider some variables such as power loss, running cost and also efficiency.

Group Members

Ade Manu Gah

Tienkha Do

Xiao Mingyu


Supervisors

Dr Nesimi Ertugrul

Dr Wen Soong