Difference between revisions of "Projects Lab"

From Projects
Jump to: navigation, search
(Bench Allocation)
(Bench Allocation: Increased to 30 benches)
Line 3: Line 3:
  
 
== Bench Allocation ==
 
== Bench Allocation ==
Total: 25 Benches
+
Total: 30 Benches
  
  
Line 35: Line 35:
 
#
 
#
 
# Group 01 (2013S2 FY)
 
# Group 01 (2013S2 FY)
 +
#
 +
#
 +
#
 +
#
 +
#

Revision as of 10:33, 15 May 2014

Introduction

This is the Projects Lab for Final Year and Master students.

Bench Allocation

Total: 30 Benches


  1. Group 31 (2014S1 M)
  2. Group 38 (2014S1 M)
  3. Group 39 (2014S1 M)
  4. Group 47 (2014S1 FY)
  5. Group 35 (2014S1 FY)
  6. Group 11 (2014S1 FY)
    • HSW ask not completed (1 member)
  7. Group 13 (2014S1 FY)
    • HSW ack not completed (1 member)
  8. Group 09 (2013S2 M)
  9. Group 03 (2013S2 ??)
  10. Group 15 (2014S1 FY)
  11. Group 10 (2014S1 FY)
  12. Group 48 (2014S1 FY)
    • HSW ack not completed (1 member)
  13. Group 36 (2014S1 FY)
  14. Group 12 (2014S1 FY)
    • HSW ack not completed (1 member)
  15. ^^
  16. Group 01 (2013S2 FY)