Difference between revisions of "Projects:2014s2-80 Swinging Crane Project"
(→10.Supervisors) |
(→10.Supervisors) |
||
Line 24: | Line 24: | ||
== 10.Supervisors == | == 10.Supervisors == | ||
− | [ | + | [http://www.adelaide.edu.au/directory/wen.soong|Dr.Wen Soong] |
== References == | == References == |
Revision as of 12:22, 6 May 2015
Project aim: Swinging Crane project is aim to transporting a payload from one place to another and reducing the consuming time as much as possible.
Contents
1.Project introduction
2.Background
3.Previous work
4.Model designing
5.Control methods designing
6.Hardware test and interfacing
7.Results comparison
8.Conclusion
9.Group members
Liyan Yi
Xianghui Ma