Difference between revisions of "Projects:2014s2-80 Swinging Crane Project"

From Projects
Jump to: navigation, search
(10.Supervisors)
(10.Supervisors)
Line 24: Line 24:
  
 
== 10.Supervisors ==
 
== 10.Supervisors ==
Dr.Wen Soong [http://www.adelaide.edu.au/directory/wen.soong]
+
Dr.Wen Soong [http://www.adelaide.edu.au/directory/wen.soong] Dr Braden Phillips [http://www.adelaide.edu.au/directory/braden.phillips]
Dr Braden Phillips [http://www.adelaide.edu.au/directory/braden.phillips]
 
  
 
== References ==
 
== References ==

Revision as of 12:24, 6 May 2015

Project aim: Swinging Crane project is aim to transporting a payload from one place to another and reducing the consuming time as much as possible.

1.Project introduction

Gantry Crane System.png

2.Background

3.Previous work

4.Model designing

5.Control methods designing

6.Hardware test and interfacing

7.Results comparison

8.Conclusion

9.Group members

Liyan Yi

Xianghui Ma

10.Supervisors

Dr.Wen Soong [1] Dr Braden Phillips [2]

References