Difference between revisions of "Projects:2014S1-41 Inductive Power Transfer"

From Projects
Jump to: navigation, search
(Project Information)
(Project Information)
Line 2: Line 2:
  
 
== Project Information ==
 
== Project Information ==
In this project we are trying to design a wireless power transformer and investigate methods of improving efficiency as the air gap gets larger, based on the previous  years suggestions and a new design that we  
+
In this project we are trying to design a wireless power transformer and investigate methods of improving efficiency as the air gap gets larger, based on the previous  years suggestions and a new design that we will achieve.In addition to that we need to consider the product to be cost and size effective.
 
 
will achieve.In addition to that we need to consider the product to be cost and size effective.
 
  
 
== Group Members ==
 
== Group Members ==

Revision as of 18:41, 2 April 2014


Project Information

In this project we are trying to design a wireless power transformer and investigate methods of improving efficiency as the air gap gets larger, based on the previous years suggestions and a new design that we will achieve.In addition to that we need to consider the product to be cost and size effective.

Group Members

Saeideh Farzaneh Kazerouni

Farnoosh Vahabzade

Hamidreza Zareinezhad


Supervisor

Dr Wen Soong

Dr Andrew Allison