Projects Lab

From Projects
Revision as of 16:08, 5 April 2019 by A1067065 (talk | contribs) (Computer Lab (IW2.31): cleaned up old allocations)
Jump to: navigation, search

Introduction

This is the Projects Lab for Final Year Honours and Master students.

  • General facilities

ECMS Technical Services Workshop ENG07+ENG34

  • open M-F 9am-1pm 2pm-5pm (Office hours)

Final Year Computer Lab IW2.32

  • accessible 24/7

EEE Electronics Store EM316

  • open during most office hours

EEE Electronics Workshop EM315 (self-serve)

  • open 10am - 4pm (Office days)

Faculty Prototyping Lab ENG08

  • open 9 - 5pm (Office hours)
Allocable space
  1. Computing Projects Lab IW2.31
    • accessible 24/7
  2. Electronics Projects Lab EM307
    • accessible M-F 7am - 9pm S-S 9am-5pm
  3. Electrical Projects Lab ENG24
    • accessible 9am-5pm (Office hours)

Lab Bench Allocation

Projects Lab (EM307)

Total: 24 Benches

  1. Group #297 (2018s2 H)
  2. Group #279 (2018s2 H)
  3. Group #293 (2018s2 H)
  4. Group #--- (------ -) Reserved for AGA, equipment
  5. Group #235 (2018s2 H)
  6. Group #191 (2019s1 H)
  7. Group #155 (2019s1 H)
  8. Group #166 (2019s1 H)
  9. Group #102 (2019s1 H)
  10. Group #--- (------ -) Reserved for WW, PC w GPU (WW), Antenna
  11. Group #--- (------ -) Reserved for Alex Makarowsky (WW) until 2 Feb 2019
  12. Group #--- (------ -)
  13. Group #--- (------ -)
  14. Group #135 (2019s1 M)
  15. Group #105 (2019s1 H) Reserved for Car hacking (MJS) in 2019s1
  16. Group #--- (------ -)
  17. Group #--- (------ -)
  18. Group #151 (2018s1 M) use extended to 30 November 2018
  19. Group #--- (------ -)
  20. Group #--- (------ -)
  21. Group #--- (------ -) Reserve for Amy Wong Ming Eer (2019) (BJP) if possible
  22. Group #--- (------ -)
  23. Group #--- (------ -)
  24. Group #136 (2018s1 H)


Specialist Equipment

Equipment Booking

https://www.eleceng.adelaide.edu.au/projlab

Computer Lab (IW2.31)

  1. IW2.31A Group #178 (2018s1 M)
  2. IW2.31B Group #--- (------ -)
  3. IW2.31C Group #--- (------ -)
  4. IW2.31D Group #101 (2019s1 H)(DSTG computer)
  5. IW2.31E Group #--- (------ -)(SAS DSTG computer) Reserved for 2019s2
  6. IW2.31F Group #297 (2018s2 M)
  7. IW2.31G Group #279 (2018s2 H)
  8. IW2.31H Group #--- (------ -) (2 PC's)
  9. IW2.31M Amy Wong Ming Eer (2018 summer) (BJP)
  10. IW2.31N Group #176 (2019s1 H)
  11. IW2.31P Group #165 (2019s1 H)
  12. IW2.31Q Group #169 (2019s1 H)
  13. IW2.31R Group #--- (------ -)(2 Screens)
  14. IW2.31S Group #117 (2019s1 H) (Originally Group #167, Project scope changed)
  15. IW2.31T Group #285 (2018s2 H)
  16. IW2.31U Group #111 (2019s1 H)
  17. IW2.31V Group #270 (2018s2 H)

Power Lab (NG24)

  1. Group #--- (------ -)
  2. Group #187 (2019s1 H)
  3. Group #192 (2019s1 H)
  4. Group #--- (------ -)
  5. Group #180 (2019s1 H)
  6. Group #183 (2019s1 H)

Autonomous Vehicle Workshop (NG25)

  1. FSAE Motor Sport Team

Research Laboratory (NG27)

  1. Group #183 (2019s1 H)
  2. Group #131 (2019s1 H)
  3. Group #--- (------ -)
  4. Group #--- (------ -)