Projects:2014s2-82 Grid Integration of Solar PV Embedded Generation

From Projects
Revision as of 12:27, 2 June 2015 by A1651329 (talk | contribs)
Jump to: navigation, search

Project Information

Modeling and Probabilistic Analysis

Modeling

The power system uncertainty modeling includes models of power system demand, wind power generation and solar PV generation.

Power System Demand

Based on literature review the power system demand can be modelled by normal distribution. And the demand is normally varying in regions, in different dates and seasons, so for a regional demand the models are split up in a warmer and a cooler period, further, split up in weekdays and weekends. Meanwhile due to the high ambient temperature in warmer period, the demand curve is significantly different when the temperature is over 35℃, so for warmer period the demand model will be split up further by the temperature. And as an example, the 6 different types of mean value of demand curve from Metro Region are shown in Figure 1. [[File:Picture1.png]Figure 1: Yearly mean of demand in Metro Region]





Experiment and Data Analysis

Experimental Setup

Results

Conclusion

Outcomes

Future work

Team

Group members

Hang Yin

Kai Sun

Supervisor

Dr Rastko Zivanovic [1]

ElectraNet [2]



References